Techcom

Products

Techcom MineTechcom Fab · in developmentTechcom Pit · in development

Services

Wireless networksFiber-optic networksNetwork documentationSoftwareContacts

Network documentation

Survey and inventory of enterprise communication networks: equipment, cable lines and their routes — in diagrams, registers and on a 3D model.

  • DWG
  • VSDX
  • XLSX
  • PDF
  • JPG
  • 3D

Deliverables

DWG

Plans and routes of cable lines on the site master plan or the survey base map.

VSDX

Network block diagrams, patch panel and connection diagrams.

XLSX

Registers of equipment, cables, ports and fibers — for asset records and export to enterprise systems.

PDF

Network passport: a consolidated document for operations and contractors.

JPG

Photos of nodes, cabinets, patch panels and labels — linked to the register and diagrams.

3D

Network nodes, equipment and cable routes on a 3D model.

Scope of work

Site survey

Walkdown of network nodes, cable routes and equipment locations; photos, measurements, reconciliation with existing documentation.

Inventory of equipment and cable lines

Type, model, serial number, location and connections of every device; cables, ports, fibers.

Diagrams and plans

Block diagrams, patch panel diagrams, route plans on the master plan or the survey base map.

3D model

Equipment and cable lines on a 3D model of the site; route lengths and equipment lists taken from the model.

Design considerations

Unified labeling

One naming system for nodes, cables and ports — in diagrams, tags and registers.

Georeferencing

Equipment and route positions on the site master plan, the survey base map or building plans.

Existing documentation

Old diagrams checked against the actual installation; discrepancies listed separately.

Company standards

Templates, symbols and formats as required by the client.

Keeping it current

Procedure for updating records after repairs and network expansion.

Handover to operations

Documents for communications, IT and contractors; export to asset management systems.

Sites

Underground minesShafts, workings, network nodes on each level
Open pitsPit walls, overhead racks, transfer points, site buildings
Plants and industrial sitesWorkshops, process buildings, warehouses, office buildings
examples of work
  • underground mine · 19 levels · 350 network nodes · 80 km of cable
  • open pit · 400 equipment items · register and diagrams
  • processing plant · 80 cabinets · 2,400 ports
  • mine · 3D model · 220 km of routes · 250 devices

How the work is done

  1. step 1RequestSite, scope boundaries, existing documentation
  2. step 2SurveyWalkdown of nodes and routes, photos, measurements
  3. step 3InventoryRegisters of equipment, cables, ports and fibers
  4. step 4Diagrams and modelDiagrams, route plans, 3D model
  5. step 5Network passport handoverDocument set, update procedure